• End Customer: Buckinghamshire County Council
  • Sector: Education
  • Type: New Build
  • Contacts:
    • Main Contractor: Willmott Dixon
  • Location: Buckinghamshire

Products installed

Alternate Text

36 HVR Zero systems

Alternate Text

4 Windcatcher X-Air 170 systems

Alternate Text
Alternate Text

Monodraught have been awarded the contract to provide hybrid and natural ventilation systems for a new Sports Hall and Classroom block, associated with refurbishment works to the existing school. The project included the refurbishment of the sports hall into a dining hall, which opens onto a new central courtyard. It also provided additional science laboratories and redeveloped the existing English department into a dedicated SEN corridor. Key aims of the project sought to deliver the ideal indoor air quality for a learning environment in an up-to-date building, comply with the current regulation standards and meet the needs of the students in the expanding school.

Monodraught hybrid and natural ventilation solutions were provided to this flagship school. The HVR Zero systems were installed throughout the school classrooms, halls and corridors and Windcatcher natural ventilation systems were selected for larger spaces such as the sports hall. Data monitoring has shown that the systems are performing strongly with low running costs and excellent air quality. Average temperatures were maintained at an average of 21°C during occupied hours.

Alternate Text

Need any help?

Enquire now...

             
Submit
×