Future School Project, Al Ain-UAE

Four identical schools (2 boys an 2 girls schools) are modelled the same as Mezyed School. The courtyard is shaded by solar panels, which provide 15% of the schools electricity and the walls are lined with plants, which are used to optimize the oxygen in classrooms. Edison Lighting has installed a total of 889 nos 530 mm SUNPIPES in all four schools combined with 228 motorised light shut dampers in a record breaking time scale of only 6 weeks.

This is the largest project Monodraught has ever managed and will be a great advertisement to us for the educational sector throughout the Gulf-Region.